|
Consultancy
Objectives
The main objective of this
consultancy is to conduct and to elaborate a consistent water facility
master plan for the water supply and distribution systems of the
Northern Governorate up to year 2025. The planning area embodies:
Jabalia town and camp, Beit Lahia town, Beit Hanoun town, Um Nasser
village in addition to El-Sheikh Zayed City.
Tasks
Conducted by EMCC
- Data collection and review of
related works.
- Assessment of the existing
water supply and distribution systems of the planning area.
- Identification of the main
water supply and distribution problems as well as demand needs.
- Definition of the planning
basis and design criteria.
- Conceptual design of the
water supply facilities (production and distribution).
- Hydraulic model analysis of
the current and future water distribution systems using WaterCAD v.7
software.
- Elaboration of a realistic
Master Plan based on investment priorities.
- Establish alternative
scenarios for the water Master Plan.
- Inventory of specific
projects for the implementation of the proposed Master Plan.
- Priority works and packaging
for the proposed projects to be implemented.
- Estimate of budget for the
implementation of the proposed projects in the Master Plan.
- Preparation of 3-years
investment plan for the outputted projects.
- Presentation of the planning
schemes, scenarios, and outputs.
- Organization of workshops to
present the progress of the project and the final results.
- Provide on-job training to
the Municipal staff.
|